Disaster Recovery Plan
In the event of a disaster the following policies and procedures shall be followed:
Responsible Persons: The following individuals are responsible for the following issues in the event of a disaster:
Lawrence Hilton — Brokerage Management System;
Gordon Cain — Computer Network;
Wesley Hilton — Employee Communications; and
John Brooke — Physical Facilities.
Internet Outage:
Dominion maintains fully redundant internet access through two separate providers. Further, because all of its electronic records and mission critical servers exist on site and Dominion operates fully independent of the internet, with the exception of email, an internet outage, even for an extended period, would not affect brokerage operations. In addition, Dominion maintains a redundant array of fax machines, which can function both on internet and POTS phone lines.
System Recovery: In the event of a system compromise resulting from a virus or hacker attack, Dominion maintains data backups for one year, as well as offsite backup servers.
Auxiliary Power:
Dominion's offices located at 341 South Main Street, Suite 100, Alpine UT 84004 is equipped with battery backups for all essential systems, as well as an emergency generator plug in. Each of the Owners, all residing within two miles of the office have emergency generators which can easily be transported to the Dominion offices in the event of a long-term power outage.
Alternate Locations: Approvals have been secured from the relevant municipalities for business operations to be conducted from one or more of the following alternate locations, consisting of the personal residences of the owners, in the event of an emergency:
5452 Stone Creek Drive, Highland, UT 84003;
260 North Matterhorn Drive, Alpine, UT 84004; and
12362 North Wildflower Lane, Highland, Utah 84003 Stone Creek Drive, Highland, UT 84003.
Communications: Dominion maintains the following alternative communications systems:
POTS lines;
Cellular lines; and
HAM radio systems.

